Skip to main content

Fault Finding

Industrial Automation Fault Finding in Sydney

CIC helps Sydney and NSW sites chase down stubborn automation faults, intermittents, and post-commissioning issues — across PLCs, drives, instruments and field wiring.

CIC technician working inside an industrial control panel

What automation fault finding is

When a machine stops and the cause is not obvious, automation fault finding is the methodical hunt for why. CIC traces the problem from the symptom back through the signal path — alarms, HMI, PLC inputs and outputs, drives, interlocks, sensors and field wiring — to find the actual root cause rather than swapping parts and hoping.

We are most useful on the faults that survive a reboot: intermittents, problems that appeared after a modification or shutdown, and breakdowns where the maintenance team has run out of obvious leads. Where it is urgent, contact us to discuss availability — we confirm honestly what we can get to and when.

What we cover

  • PLC, drive and HMI fault investigation
  • Intermittent faults that survive a reboot
  • Field device, sensor and wiring faults
  • Post-modification or post-shutdown issues
  • Root-cause notes you can hand back to your team

Where automation faults hide

  • PLC inputs and outputs that do not match the field
  • Sensors, proximity switches and instruments reading wrong or intermittently
  • VSDs and drives faulting, tripping or derating
  • Safety interlocks, e-stops and guarding circuits stopping the machine
  • Alarms and HMI messages that point in the wrong direction
  • Field wiring, connectors and terminations affected by vibration or moisture

Who this is for

  • Maintenance teams stuck on a stubborn fault
  • Sites recovering after a shutdown
  • Contractors needing a second pair of eyes
  • OEMs supporting commissioned plants from afar

Typical fault finding call-outs

  • A line down with no clear cause and production waiting
  • An intermittent fault that will not reproduce on demand
  • A machine that started misbehaving after a recent change or shutdown
  • A drive or PLC fault the team cannot get to the bottom of
  • A second set of eyes needed before parts get ordered

How CIC approaches this work

Methodical

We work from the symptom back through the signal path, not guesses and parts swapping.

Across the stack

Comfortable from field wiring through drives and PLC code up to the HMI and SCADA layer.

Documented

We hand back a short note on what was wrong and what we did, so the next person isn't in the dark.

Enquire

Discuss a fault

Tell us a bit about your site, the equipment and how urgent the work is. Availability for urgent, shift and shutdown work is confirmed case by case.

Urgency

This helps us triage availability; it is not a response-time guarantee.

Upload photos or drawings? That can be added later - for now, please describe what you need and we'll follow up by email.

By submitting you agree we may contact you about your enquiry.

Call NowRequest a Quote