Resources
Notes, checklists and practical guides
Short, practical notes for the people running NSW industrial sites, including maintenance teams, controls techs and contractors.
Practical note
Planning a brownfield PLC modification
Before changing a running plant, confirm current PLC and HMI backups, affected I/O, rollback options, access permissions, test steps and who signs off the change.
Practical note
Shutdown prep for controls work
Line up drawings, parts, isolations, access, test equipment, program backups, commissioning sequence and handover notes before the shutdown window starts.
Practical note
Fault finding intermittent automation issues
Work from the symptom back through sensors, field wiring, drives, PLC logic and HMI alarms. Capture evidence before swapping parts or resetting equipment.
Practical note
Control panel wiring habits that save commissioning time
Clear labels, consistent ferrules, sensible cable routes and point-to-point checks reduce avoidable delays when commissioning moves onto the floor.
Need help applying this on site?
If a controls issue is holding up production, a shutdown or a commissioning deadline, contact CIC with the site details.